Project Overview
This project involved structural framing work focused on reconfiguring interior spaces. First, existing walls and ceilings were selectively opened to allow access to framing, insulation, plumbing, and electrical systems. Then, new wall layouts were framed to redefine room boundaries and improve spatial flow. Additionally, ceiling sections were modified to accommodate mechanical adjustments and proper insulation placement. As a result, the structure was prepared to support subsequent phases, including drywall installation and interior finishes, while maintaining structural integrity and alignment.
Completed Work Highlights
- Removal of existing interior walls and ceiling sections
- Installation of new structural framing for redefined layouts
- Exposure and adjustment of plumbing and electrical rough-ins
- Reinforcement of window and door openings
- Ceiling framing modifications for mechanical access
- Preparation of spaces for drywall and finishing stages
Project Features & Finishing Details
Throughout the project, structural framing was executed with precision to ensure accurate room dimensions and proper load distribution. In addition, ceiling cavities were opened to allow insulation adjustments and mechanical updates. Meanwhile, wall framing was aligned to accommodate plumbing stacks, electrical lines, and future fixtures. Furthermore, reinforced headers and framing supports were installed where openings were modified. Overall, the structure was organized to provide a clean, stable foundation for drywall installation, ensuring long-term durability and functionality.
Client Goals & Final Outcome
The primary goal was to reorganize the interior layout while maintaining structural integrity and improving system accessibility. Ultimately, the project resulted in clearly defined spaces, improved circulation, and a structure ready for finishing work. Consequently, the interior gained both functional clarity and construction readiness.
Key Benefits of Choosing Our Team
- Accurate structural layout execution
- Organized and methodical demolition process
- Proper coordination between framing and utilities
- Clean preparation for subsequent construction phases
- Consistent attention to structural stability




